Saturday, February 1, 2003

Temporary pier

Temporary pier, Hungerford Bridge, London

Temporary pier
Hungerford Bridge
London, January 2002

“The 300 m (980 ft) long decks were raised using an innovative method called incremental launching, in which each 50 m (160 ft) long section was pulled across the river using a 250 m (820 ft) long steel truss weighing 300 tonnes. This process was repeated five times until each deck spanned the river, supported by six temporary piers made of steel and concrete. The seven 25-tonne pylons were then raised over the subsequent two weeks. Once the pylons had been installed, the decks were jacked up to enable their connection with the cable stays suspended from the pylons. The concrete deck was then lowered into its final position and the temporary piers and supports were dismantled.” (Golden Jubilee Bridges, Wikipedia)

No comments: